PUBLISH WORKFLOW
Pre-publish review
Run the final checks against the current Draft. Publishing creates a frozen plan snapshot; warnings can be reviewed and accepted.
Publication checklist
Current actor: Demo planner · planner · Draft revision 1
- Capacity validatedPassed
Every route is within the 20-unique-stop limit.
- Order eligibility validatedPassed
Every assigned linked order is ready_to_ship and has a verified usable delivery location.
- Duplicate assignments checkedPassed
No duplicate stop or order assignment exists in this or another effective active plan.
- All stops accounted forBLOCKER
8 candidate stop(s) do not have exactly one route or deferral decision.
Assign each remaining stop or record a deferral in the planning workspace.Open route planningROUTE-1-01 · ROUTE-1-02 · ROUTE-1-03 · STOP-1-065 · STOP-1-066 · STOP-1-067 · STOP-1-068 · STOP-1-069 · … - Deferral reasons completePassed
8 explicit deferral record(s) are complete.
- Warehouse round trip confirmedPassed
Every route explicitly starts and ends at the selected MGD Mall warehouse.
- Locks and pins preservedPassed
1 locked route(s) and 2 pinned stop(s) are preserved.
- Plan version currentPassed
The snapshot matches current Draft PV-BATCH-2026-11-10-001 at revision 1.
- Publisher authorizedPassed
Demo planner has the planner role.
- No existing published snapshotPassed
This Draft has no published snapshot yet.
- Waiting threshold reviewedWARNING
39 candidate stop(s) exceed the configured 3-day waiting warning.
Review waiting stops and decide whether to include or defer them.Review ready ordersSTOP-1-005 · STOP-1-006 · STOP-1-010 · STOP-1-011 · STOP-1-012 · STOP-1-013 · STOP-1-016 · STOP-1-018 · … - High route counts reviewedWARNING
3 route(s) are at or above 80% of the configured stop capacity.
Review high-count routes. This warning does not estimate travel time or duty workload.Open route planningROUTE-1-01 · ROUTE-1-02 · ROUTE-1-03 - Explicit deferrals reviewedWARNING
8 stop(s) will not be included in this published route plan.
Review recorded deferral reasons before continuing.Review deferred stopsSTOP-1-057 · STOP-1-058 · STOP-1-059 · STOP-1-060 · STOP-1-061 · STOP-1-062 · STOP-1-063 · STOP-1-064